Water Solutions for Africa, Inc.

Goals:

Short term:
  • To see enough funds raised to be able to build a well and reservoir per month in 2005
  • To see groups or foundations/companies take on the concept of "adopt a village" (give them a complete system)
  • Have enough equipment for 1 team to operate in 2005 without having to rent or borrow it.
  • Start the "green line in the sand" - help the 15th parallel across Mali go green.
Long term:
  • Be able to build 2 or more wells and reservoirs per month every year.
  • See these groups or foundations/companies to return to adopt another village each year.
  • See the 15th parallel turn green as a result of the villages along the parallel with adequate water and stop the advance of the Sahara there.
  • See stronger and healthier people as a result of our work and efforts.

  • MALI, WEST AFRICA -- FOUND IN THE MIDDLE OF WEST AFRICA
  • 500,000 SQ. MILES IN AREA WITH 12 MILLION PEOPLE
  • MOSTLY SAND AND CLAY THRU THE MIDDLE OF MALI
  • SOME ROCK IN WEST MALI AND EAST MALI
  • SEE MORE FACTS + STATS FROM WATERAID/UK ABOUT THE SITUATION IN MALI.  SEE WHAT WE ARE UP AGAINST + HOW THIS PROJECT CAN BE A HELP


  • DEEP WATER WELL -- AVERAGE 60 TO 100 METERS DEEP
  • 5 INCH CASING PIPE
  • 2 INCH WATER DISCHARGE PIPE
  • SUBMERSIBLE PUMP ( FRANKLIN 3 PHASE )
  • 5 HORSE PUMP MOTOR

  • ABOVE GROUND, EARTHEN RETAINING WALLS
  • 12 X 16 X 4 METERS ARE THE DIMENTIONS OF INSIDE WALL ( BEFORE BANKING THEM WITH EARTH )
  • RUBBER LINER - ALL ONE PIECE
  • 6 INCH DISCHARGE PIPE REDUCED TO 2 INCH FOR DISPERSION
  • 30 DEGREE BANK ON INSIDE AND 45 DEGREE BANK TERRACED ON OUTSIDE

  • ELECTRICITY IF THE VILLAGE HAS IT ALREADY
  • SOLAR PANELS AND BATTERIES FOR POWER STORAGE WHERE THERE IS NO ELECTRICITY AVAILABLE

  • SMALL BUILDING OR HUT ONSITE NEAR WELL
  • FOR STORAGE OF PARTS, BATTERIES, CONTROL VALVES, ETC.
  • PLACE FOR SOLAR PANELS TO PLACED